● Which statement about the preliminary design stage of a software development project is true? __(71)__ .(71)A.The preliminary design is an internal document used only by programmersB.The preliminary design is the result of mapping product requirements i
<尚大教育,教育至上,人才为大:sdedu.cc>

● Which statement about the preliminary design stage of a software development project is true? __(71)__ .

(71)A.The preliminary design is an internal document used only by programmers

B.The preliminary design is the result of mapping product requirements info software and hardware functions

C.The preliminary design of the product comes from the requirement specification

D.The developers produce the preliminary design by defining the software structure in enough detail to permit coding

● You are a project manager for a small project. Your project was budgeted for ¥500,000 over a six-week period. As of today, you’ve spent ¥260,000 of your budget to complete work that you originally expected to cost ¥280,000. According to your schedule, you should have spent ¥300,000 by this point. Based on these circumstances, your project could be BEST described as __(72)__ .

(72)A.Ahead of schedule

B.Behind schedule

C.On schedule

D.Having not enough information provided

● Sub-contractors should obey the contractor in information system project. When censoring sub-contractors, the supervisor mostly concerns about __(73)__.

(73)A.Amount of subcontract

B.qualifications and abilities of sub-contractors

C.responsibilities and obligations of sub-contractors

D.the contents of the subcontract

● A work breakdown structure (WBS) is a tool used to define and group a project’s discrete work elements in a way that helps organize and define the total work scope of the project. A WBS is most useful for__(74)__.

(74)A.identifying individual tasks for a project

B.scheduling the start of tasks

C.scheduling the end of tasks

D.determining potential delays

● 10BaseT is an Ethernet LAN term meaning a maximum transfer rate of 10Mbps that uses baseband signaling and twisted pair cabling. A 10BaseT Ethernet LAN has a __(75)__ topology.

(75)A.star

B.ring

C.bus

D.none of the above

<尚大教育,教育至上,人才为大:sdedu.cc>
 
   各省软考办 
 
来顶一下
返回首页
返回首页
上一篇:2011年上半年信息系统监理师考试上午真题(61-70)
下一篇: 2011年上半年信息系统监理师考试上午真题(1-10)
 相关文章
 
 
跟贴共
笔 名 :   验证码:
网友评论仅供其表达个人看法,并不表明尚大教育同意其观点或证实其描述
距离2023年05月27-28日软考考试还有
尚大软考交流群:376154208
软考各地考务机构
历年真题汇总




各省市软考报名简章