2012年上半年 信息系统项目管理师 上午试卷(71-75)
来源:尚大教育 作者:尚大教育 时间;2018-12-06 09:25:16 点击数: 尚大软考交流群:376154208
试题71-命-技-N.ZJ.00.p000-9.00-The connection between two networks to from an internet is handled by a machine known as a (71)。
(71) A、bridge B、server C、router D、switch
试题72-命-技-N.ZJ.00.p000-9.00-The TCP protocol is a (72) layer protocol
(72) A、physical B
<尚大教育,教育至上,人才为大:sdedu.cc>

试题71-命-技-N.ZJ.00.p000-9.00-

The connection between two networks to from an internet is handled by a machine known as a (71)。
(71) A、bridge B、server C、router D、switch
 

试题72-命-技-N.ZJ.00.p000-9.00-

The TCP protocol is a (72) layer protocol
(72) A、physical B、network C、transport D、application
 

试题73-命-技-N.ZJ.00.p000-9.00-范围确认

An example of scope verification is (73)
(73) A、review the performance of an installed software module
B、managing changes to the project schedule
C、decomposing the WBS to a work package level
D、performing a benefit/cost analysis to determine if we should proceed with the project
 

试题74-命-技-N.ZJ.00.p000-9.00-进度控制

Your project is behind schedule due to conflict between team members. Having resolved the conflict, to get the project back on schedule, you should consider (74)
(74) A、crashing the schedule
       B、performing resource leveling
       C、conducting reverse resource allocation scheduling
D、utilizing the critical chair resources
 

试题75-命-技-N.ZJ.00.p000-9.00-

You have just taken control of a project in the middle of execution and need to learn who has approval authority for revisions in scope. (75)document provides this information.
(75) A、Resource assignment matrix B、Change control plan
C、Project charter D、Client organization chart
 
<尚大教育,教育至上,人才为大:sdedu.cc>
 
   各省软考办 
 
来顶一下
返回首页
返回首页
上一篇: 2012年上半年 信息系统项目管理师 上午试卷(61-70)
下一篇:2012年上半年信息系统项目管理师真题下午案例分析---【大汇总】
 相关文章
 
 
跟贴共
笔 名 :   验证码:
网友评论仅供其表达个人看法,并不表明尚大教育同意其观点或证实其描述
距离2023年05月27-28日软考考试还有
尚大软考交流群:376154208
软考各地考务机构
历年真题汇总




各省市软考报名简章